DEWA & Dubai Municipality approved · ISO 9001 · 14001 · 45001

Industrial warehouses with rooftop solar and a battery storage yard in the UAE desert

DEWA approvedDubai MunicipalityISO certified

Solar + BESS rental & clean energy.

Battery units from 60 to 1000 kWh for construction and remote sites. Save 20–50% on running costs.

  • 60–1000kWh BESS
  • 20–50%Savings
  • 70+Projects
  • 20+ MWSolar

Our services

All

Featured solutions

Our BESS installations

More

Our projects

Solar
Robotic solar panel cleaning2.7 MW
Agility Dubai DipDubai, UAE
Solar project at University of Dubai680 kWp
University of DubaiDubai, UAE
Dubai Municipality building300 kWp
Dubai Municipality ClinicDubai, UAE
Solar carport parking structure450 kWp
Solar car parkingDubai, UAE
Commercial building with rooftop solar800 kW
Corporate Office ComplexAbu Dhabi, UAE · Commercial
Villa with rooftop solar panels120 kW
Luxury Villa CommunitySharjah, UAE · Residential
Aerial view of a solar array750 kW
High-Rise Apartment ComplexDubai, UAE · Residential
Industrial rooftop solar installation2.5 MW
Manufacturing PlantRas Al Khaimah, UAE · Industrial
Solar carport parking structure1.8 MW
Logistics WarehouseJebel Ali, UAE · Industrial
Solar-powered landscape lighting45 kW
Public Park Solar LightingDubai, UAE · Government

What clients say

Aozon Energy delivered beyond our expectations. Their solar solution reduced our energy costs by 40% and their maintenance team is exceptional.
AAAhmed Al MansooriDubai Mall Management
The residential solar installation has eliminated our electricity bills. Aozon’s team was professional, efficient, and the system works flawlessly.
FAFatima Al ZahraSharjah Villa Community
Our factory’s energy costs were a major concern. Aozon’s solar solution cut our bills in half while reducing our carbon footprint significantly.
OHOmar HassanRAK Manufacturing

Why Aozon Energy

  • DEWA approvedApproved contractor
  • Dubai MunicipalityApproved contractor
  • ISO certified9001 · 14001 · 45001
  • 24/7 supportMonitoring & O&M
Talk to an engineerMon–Sun · 8 AM – 6 PM · replies within 30 minutes
Industrial warehouses with rooftop solar and a battery storage yard in the UAE desert

Construction & remote sites

Solar + BESS rental solutions.

Reliable, clean and cost-effective power from 60 to 1000 kWh. Power your site without high fuel costs and save 20–50% on your running cost.

Aozon Energy containerised battery energy storage unit installed on site next to a solar array

Battery energy storage

Uninterrupted power, zero emissions.

All-in-one battery units (battery, inverter, EMS and HVAC) that replace diesel generators and keep critical operations running.

Large solar field in the GCC

Solar power systems

Clean energy today, lower cost tomorrow.

On-grid, off-grid and hybrid solar, designed and installed by a DEWA and Dubai Municipality approved contractor.

Rows of containerised battery energy storage systems at a utility-scale site

Integration & support

Solar, battery and generator, working as one.

Integration, commissioning, remote monitoring and maintenance for every system we deliver or rent.

Utility-scale desert solar farm with battery storage containers

Smart energy. Better future.

Powering a sustainable future.

Renewable energy and building solutions you can trust, across the UAE and the GCC.

Approved & certified

  • Dubai Electricity & Water Authority (DEWA)DEWAApproved contractor
  • Dubai MunicipalityDubai MunicipalityApproved contractor
  • ISO9001Quality management
  • ISO14001Environmental management
  • ISO45001Health & safety
Aozon Energy containerised battery energy storage unit installed on site next to a solar array

60 – 1000 kWh

Solar + BESS rental

Power your site without high fuel costs.

Our all-in-one battery units (battery + inverter + EMS + HVAC, with solar integration) replace or support diesel generators on construction sites, remote locations and site offices.

Reliable, clean and cost-effective: rent the capacity you need for as long as you need it, and save 20–50% on your running cost without investing from your own budget.

  • Flexible rental periods
  • Fast deployment
  • Remote monitoring
  • Plug & play solution
  • Scalable capacity
  • For all site requirements

Ideal for

  • Construction sites
  • Remote sites
  • Site offices & cabins
  • Industrial sites
  • Events & temporary power
  • Telecom & critical loads

How it works

Day and night, one smart system.

Solar, battery and generator work together automatically, so your site always has power and your generator hardly runs.

Day time

Solar powers the site

  • Solar PV supplies your loads directly
  • Surplus energy charges the battery
  • The generator stays off

Night time

The battery takes over

  • The BESS powers your loads silently
  • Smart EMS manages every kWh
  • Generator only as an emergency standby
  1. Solar PVClean daytime power
  2. BESSStores & supplies energy
  3. Inverter + EMSControls the system
  4. Your siteOffices, tools, A/C, lights
  5. DG standbyBackup only when needed

Choose the best fit

Different system sizes for your site.

Three typical set-ups. We size every system to your real load profile, then send a detailed proposal with BOQ, equipment specification and commercial terms.

Scenario 1

Small site / site office

100 kWhBESS
Up to 80 kWMax load
  • 100 kWh battery system
  • Works with your existing 100 kVA generator
  • Generator runs only when the battery needs support

Typical saving: 20–50% of your running cost

Get this sized for my site

Scenario 3

Large site / higher load

500 kWhBESS + solar
Up to 250 kWMax load
  • 500 kWh battery system
  • High-efficiency solar PV
  • 100 kVA generator on standby only

Typical saving: 20–50% of your running cost

Get this sized for my site

Savings depend on load, operating hours, fuel price and solar yield on your site. Every proposal is project-specific.

Our work

Real BESS installations, built by our team.

Every system is designed, installed, commissioned and maintained by our own engineers. Here are a few from recent sites.

Battery roomLarge-scale battery bank, racked and wired

Lithium racks & hybrid invertersLive status on every module

Inside an Aozon Energy BESS container: lithium battery racks, inverter and switchgear

Inside a BESS containerBattery racks, inverter and switchgear

Aozon Energy containerised battery energy storage unit installed on site next to a solar array

Containerised BESS on siteDelivered, installed and connected to solar

Site walkthrough

Watch a complete installation

Lithium battery racks, hybrid inverters and distribution boards: a two-minute tour of a system our engineers installed and commissioned.

Plan my systemAsk on WhatsApp

Proven at scale

Numbers that power the Gulf.

From villa rooftops to multi-megawatt plants, Aozon Energy has engineered, built and maintained clean energy across the GCC.

01

20+ MW

Solar capacity installed

Across rooftops, carports and ground-mounted plants in the GCC.

02

70+

Projects delivered

Engineered, installed and maintained by our in-house teams.

03

2.7 MW

Largest ground-mount plant

Agility Dubai Dip, with a robotic panel-cleaning system.

04

24/7

Monitoring & O&M

Remote monitoring and maintenance for the plants we manage.

The energy shift

From diesel dependence to intelligent power.

How we help organisations across the Gulf cut costs and emissions, one step at a time.

  • Assess
  • Generate
  • Store
  • Optimise
Industrial energy project teams on site

01 · Assess

Understand every kilowatt

We survey your site, consumption and tariffs to find the configuration with the best return, on-grid, off-grid or hybrid.

Industrial rooftop solar installation

02 · Generate

Turn rooftops and land into power plants

High-efficiency PV, engineered for heat and dust, installed by DEWA-approved teams to the highest safety standards.

Desert solar array with battery units

03 · Store

Keep the lights on, without the generator

Battery storage shifts solar into the evening, shaves peaks and protects critical loads with instant backup.

Real-time solar monitoring dashboard

04 · Optimise

Performance you can see

Remote monitoring, robotic cleaning and planned O&M keep yield high and costs low for the life of the system.

Landmark projects

Clean energy at scale.

A selection of plants engineered, built and maintained by Aozon Energy across Dubai.

Robotic solar panel cleaning2.7 MW

Agility Dubai Dip

Ground-mounted plant with a robotic panel-cleaning system.

Solar project at University of Dubai680 kWp

University of Dubai

Rooftop PV with full O&M, including monthly wet cleaning.

Dubai Municipality building300 kWp

Dubai Municipality Clinic

Rooftop solar delivered as full EPC with ongoing maintenance.

Solar carport parking structure450 kWp

Solar car parking

Shaded parking that generates clean energy all day.

Partner · Powerlink Energy

Ready stock in Dubai, available now.

Together with our partner Powerlink Energy, we can supply and install power equipment straight from their stock yard at Dubai Industrial City, for rental, project or immediate purchase.

  • Diesel generators (QSV, GMS series)
  • PES-series portable hybrid BESS, 30–500 kWe
  • CHE-series hybrid / microgrid BESS, 30 kW – 1 MW+
  • Lighting towers & air compressors

Integrated Solar + BESS + Grid + DG solutions with up to 70% diesel savings, peak shaving and load shifting.

Testimonials

Client testimonials.

“

Aozon Energy delivered beyond our expectations. Their solar solution reduced our energy costs by 40% and their maintenance team is exceptional.

AA

Ahmed Al Mansoori

Dubai Mall Management

“

The residential solar installation has eliminated our electricity bills. Aozon’s team was professional, efficient, and the system works flawlessly.

FA

Fatima Al Zahra

Sharjah Villa Community

“

Our factory’s energy costs were a major concern. Aozon’s solar solution cut our bills in half while reducing our carbon footprint significantly.

OH

Omar Hassan

RAK Manufacturing